Vastwin

Zhangjiagang 610-ton tower transportation project

From:广瀛物流 Posted on:2019-10-16 Belong to:Oil and gas refining


Working time: January 2018 
Project Location: Shanghai Port 
Equipment specifications: a total of 92 pieces of equipment, 1,200 tons, 12,500 square meters. The largest piece 70.7*9.16*9.93 (m), 610 tons 
Job Description: Receiving goods from the Zhangjiagang factory, a batch of water and land transport to the Shanghai FOB liner delivery.